PT. INDEXIM COALINDO

DETAIL DRILLING & FEASIBILITY STUDY REPORT included : wellsite, geophysical logging, collar drillhole and topography 200ha.

PT. DEVINDO

Preliminary Survey for Hauling Road PT. Harum Sukses Mining.

PT. MEGA MULTI ENERGI

DETAIL DRILLING (2500m) included : wellsite, geophysical log & BM Geodetic establish

PT. NUSANTARA INTI PRATAMA (NIPINDO)

General mapping & confirmation PT. Dana Buana Asia

PT. TUNAS INTI ABADI (TRAKINDO UTAMA SUBSIDIARY)

JORC COMPLIANCE DRILLING (3500M) included : wellsite, geophysical logging, collar drillhole and topography 125 ha. JORC statement by Danmar Explorindo & Runge Indonesia.

PT. TUNAS INTI ABADI (TRAKINDO UTAMA SUBSIDIARY)

INFILL DRILLING (1500m) included : wellsite, geophysical logging & collar drill hole.

PT. TUNAS INTI ABADI (TRAKINDO UTAMA SUBSIDIARY)

SCOUT DRILLING (1000m) included; wellsite, geophysical logging & collar drill hole.

PT. MEGA MULTI ENERGI

Detail Geological Mapping.

PT. LIMA MUDA

Topographic survey for Hauling road construction – include BM.
Go to page: